Perth Airport

Key Points of this Job

  • The job was at the Domestic Freight terminal – Loading Deck.
  • A good deal of patching was done.
  • Approximately 100 Sq Metres of work was done.
  • There was also an extension of the yard area.
  • An area including the Taxi Rank was reinstated – Yellow sand was used to prepare and compact the area prior to bitumen being laid.

Leave a comment